
The N05-A project is part of the so-called GEMS area, an area approximately 20 to 80 kilometers north of the Ems estuary. The N05-A platform will run entirely on renewable energy from the nearby Riffgat Offshore Wind Farm. HSM has started the fabrication in Schiedam (the Netherlands) and ONE-Dyas aims to deliver the first natural gas to Dutch and German households by the end of 2024.