First Subsea has delivered a beach landing Cable Protection System for the export cables on the 25MW WindFloat Atlantic project, located 20 kilometres off the coast of Viana do Castelo in Portugal, for Portuguese transmission system operator REN for the Windplus consortium Floating Offshore Wind project.
Hengtong Group was contracted through its Submarine Business Units to deliver the export cable for the beach export system which was installed by its contractor DeepOcean at the end of June 2019. The cable protection system is designed to suit the export cable and consists of clamps, bellmouth and cable protection.