Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


For Cobra Wind International, Boskalis will transport and install five floating wind turbines for the Kincardine offshore wind farm fifteen kilometers off the coast of Aberdeen. This will be Boskalis’ first floating wind farm project.
 
The turbines with a capacity of 9.525MW each will be anchored at a depth of sixty to eighty meters. In September 2020, the heavy anchor handling tug (AHT) BOKA Falcon will start installing the anchors and chains on the seabed. In the meantime, the floating foundations will be transported from Ferrol in Spain to Rotterdam, for which Boskalis will deploy the Fjord as a semi-submersible barge. In Rotterdam, the wind turbines will be mounted on the foundations, after which the floating wind turbines are towed to the wind farm. In addition to the BOKA Falcon and Fjord, three Boskalis AHTs will be deployed on this project.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.