The turbine manufacturer Nordex has obtained a follow-up order in Poland for the delivery and installation of turbines for a wind farm for the Polish subsidiary of E.ON Climate & Renewables.
Until 2013, the manufacturer will be delivering a total of 22 N90/2500 turbines for the projects Wysoka I and II. Installation is to be performed in two phases: the first sub-section with three turbines will be set up in the course of this year, with a further 19 being added in 2013. The location of the wind farm is 100 kilometres to the south of Szczecin, near to the main Nordex production facility in Rostock. The turbines will later be serviced by a local service point belonging to the Polish subsidiary, which Nordex established in 2008.
Until 2013, the manufacturer will be delivering a total of 22 N90/2500 turbines for the projects Wysoka I and II. Installation is to be performed in two phases: the first sub-section with three turbines will be set up in the course of this year, with a further 19 being added in 2013. The location of the wind farm is 100 kilometres to the south of Szczecin, near to the main Nordex production facility in Rostock. The turbines will later be serviced by a local service point belonging to the Polish subsidiary, which Nordex established in 2008.