Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


EMR completes communications installation for UK offshore transmission systemEMR Integrated Solutions, a SCADA network and wireless telecommunications provider, has announced the completion of a communications upgrade project for the Greater Gabbard offshore transmission assets located off the coast of Suffolk in the UK.
 
The upgrade involves the deployment of 100Mbps resilient microwave radio links, specifically designed for marine applications.  The links, located at two offshore substations, will transport plant information including wind turbine data, ensuring uninterrupted operational information to the onshore transmission SCADA system. The team at EMR recommended the use of Advanced Space Diversity technology which uses fewer antennae for microwave connectivity. Three antennae, rather than the traditional four, provide a hybrid system with two separate paths.  If one path is degraded due to tidal effects, the system immediately switches to the second path without any alarm or interruption.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.