
Fugro will perform geophysical and unexploded ordnance (UXO) magnetometry surveys, which will be used to prepare an integrated geological and geotechnical soil model on which wind farm developers will base future tenders. The fieldwork will run from May to November 2021, resuming in February and March 2022, and will comprise two phases: Phase 1 will deliver the geophysical surveys, including seabed sampling and soil data down to at least 100 m below the seabed; Phase 2 will be the UXO magnetometry survey, using Fugro’s Geowing solution.