Gamesa has signed a contract with Wigton Windfarm Limited, a subsidiary of Petroleum Corporation of Jamaica, for the turnkey construction of the Wigton III wind farm with a installed capacity of 24MW.
Gamesa will install 12 of its G80-2.0MW wind turbines at the Wigton III facility being built in Manchester, to the south of the island. The turbines are due to be delivered during the third quarter of this year and the facility is slated for commissioning by February 2016.