Gamesa has secured the first two orders for the G114-2.0 MW turbine in India.
The first order, placed by an independent power producer, encompasses the installation of 50 of its G114-2.0 MW class S at a project located in the state of Andhra Pradesh, which will be commissioned during 2016. The second order is placed by an Indian renewable energy developer and includes the supply of 42 of its G114-2.0 MW class S turbines to a wind farm located in the state of Karnataka. The project is slated for commissioning in December 2016. The turbines will be manufactured at the nacelle factory in Mamandur, close to Chennai.