GE Renewable Energy has announced that it has been selected by ReNew Power to provide 120 GE 2.5-132 turbines for the Gadhsisa Wind Farm in Gujarat, India.
The wind farm will have a total installed capacity of 300MW. The 2.5-132 turbines have been designed primarily at GE's Technology Centre in Bangalore, India. GE will also maintain the facility, which is due to be commissioned progressively by end of 2019, for a period of 10 years.