Heerema Marine Contractors has announced that it has been awarded an offshore wind foundation installation contract for EnBW's He Dreiht offshore wind farm.
The work includes the transport and installation of 64 monopiles and transition pieces. During operations, Heerema will use the IHC IQIP double-walled noise mitigation system NMS-10,000 amongst other systems to reduce noise pollution. The 900MW He Dreiht wind farm is located in the German North Sea, 90 km northwest of Borkum and about 110 km west of Helgoland and is scheduled to go into operation in 2025.