PGE Baltica, subsidiary of PGE Group, is starting the stage of measuring of wind resources and metocean data collection for the needs of the Baltica 1 offshore wind farm.
The campaign will be carried out by Eolos Floating LiDAR Solutions. It will start in the second half of May 2022 and will last for about two years. As part of the measurement campaign for the Baltica 1 wind farm, LiDAR (Light Detection and Ranging) technology will be used, mounted on a floating buoy. The Floating Lidar System (FLS200) engaged in the measurement campaign is currently being refurbished at the EOLOS workshop in Barcelona, from where it will be transported by road to Władysławowo for its assembly and preparation to be installed at the Baltica 1 site during the second half of May.