Iberdrola has begun commissioning of Polish wind farm Korytnica II, located 80 km from Warsaw in the province of Węgrów, Mazowieckie region. The wind farm comprises 14 Vestas V126 wind turbines, with a hub height of 132 metres and 3.6 MW unit capacity, bringing total capacity of 50.4 MW.
Korytnica II's output will be sold through a power purchase agreement (PPA) to Norway's Statkraft, backed by a contract for difference (CFD) obtained in the fourth auction held in Poland in June 2021. Full operation of this facility, scheduled for the first quarter of 2023, will bring Iberdrola's onshore wind capacity in Poland to 163 MW. The company already operates the Zopowy wind farm (30 MW) in the Opole region and the Korytnica I (82.5 MW).