GE Renewable Energy has announced a commitment to provide Invenergy with 120 GE2.5-116 90-meter turbines for the Santa Rita wind farm in Reagan County, Texas.
The 300MW wind farm is expected to be commissioned in 2018. A portion of the turbines installed at the Santa Rita wind farm will include blades manufactured by LM Wind Power, which was recently acquired by GE Renewable Energy. GE will also implement their Digital Wind Farm solutions, including software to support wind operations including Asset Performance Management analytic capabilities and cyber security through its SCADA secure edition.