The Floatgen project, which will result in the installation of France’s first offshore wind turbine, has unveiled its new website (live . floatgen . eu). In order to monitor as close as possible the progression of the project, the team has developed a communication tool which propose to both watch the construction in real time and stay informed about the next steps to come.
The construction advances at a rapid pace as most of Floatgen mooring system’ materials have already be unloaded at Saint-Nazaire as well as the wind turbine. The barge on which the construction is taking place (led by Bouygues Travaux Publics) is already in position Quai des Charbonniers.