The Netherlands Enterprise Agency (RVO) has awarded MMT with a contract to perform a geophysical soil investigation of the Ten Noorden van de Waddeneilanden wind farm zone.
The objective of the investigation is to contribute to the bathymetrical, morphological and geological understanding of the area. Project preparations are currently underway, with the fieldwork planned to be performed in July and August from MMT’s survey vessel Franklin. The data will be used by offshore wind farm developers to prepare bids for this site.