NACEL Energy Corporation has announced it will participate as co-developer, with Crownbutte Wind Power Inc. of Mandan, ND, in the 200MW Gascoyne II wind power project.
Gascoyne II is located between the towns of Bowman and Hettinger North Dakota, extending over 1733 acres on a ridgeline at elevations averaging 3000 ft.
Gascoyne II is located between the towns of Bowman and Hettinger North Dakota, extending over 1733 acres on a ridgeline at elevations averaging 3000 ft.