Natural Power has been appointed by Vattenfall to undertake services during the construction phase at the 240MW, 50-turbine South Kyle wind farm in East Ayrshire and Dumfries and Galloway, Scotland.
Natural Power will undertake the day-to-day site management on behalf of Vattenfall as well as providing other services including: FIDIC engineer, principal designer, ecological clerk of works, planning monitoring officer and geotechnical engineer. Natural Power has already been working with Vattenfall at South Kyle during the pre-construction phase, delivering site investigation, pre-construction planning work, ecology and hydrology services. Preparatory works are already in progress on site and the wind farm is expected to start generating electricity by early 2023.