Formosa Wind Power Co. Lt has signed a firm and unconditional Turbine Supply Agreement (TSA) for the test project of Formosa 1 Offshore Wind Farm, Taiwan’s first utility-size offshore wind farm.
Siemens Wind Power has been awarded with the contract and will deliver two 4 MW turbines to be installed 2016 for the Formosa 1 Phase 1. The Formosa 1 Offshore Wind Farm is located near the coast of Miaoli County.