Nordex has received three contracts for the installation of its N117/2400 and the N117/3000 turbines in Turkey, totalling 64.2MW.
The company will be supplying to the new customer Erdem Holding seven N117/3000 Generation Delta turbines for the Odemis wind farm. This order also includes a premium-service contract for a minimum period of five years. The wind farm Odemis is located south east of Izmir, close to the Aegean coast of Turkey. The N117/3000 will be installed with a hub height of 91 metres. The rotor blades, towers and anchor cages will be produced in Turkey.
In order to expand its 30MW Edincik wind farm to 56.4MW, Edincik Enerji ordered eleven N117/2400 turbines designed for light wind sites. The contract includes a Nordex premium service agreement for six years. The third new signed contract is the extension of the existing 25MW Bandirma III wind farm of the customer Bursa Temiz Enerji. Seven N117/2400 turbines will expand the wind farm close to the port city of Bandirma in the Marmara Region to 41.8MW.