Nordex has received a follow-up order from its customer AES Generación. The Vientos Neuquinos wind farm comprises 24 AW132/3465 turbines and is to be built in the province of Neuquén in the south-west of Argentina.
AES Generación. has also ordered service for the turbines covering a period of at least two years. The turbines and the 120-metre concrete towers for the wind farm will be produced locally in Argentina. In September 2018 the company placed an order with Nordex for the supply of 30 turbines AW132/3300 for the Energética wind farm.