A joint venture between Macquarie Asset Management's Green Investment Group and Hydro Rein has placed an order with the Nordex Group for the supply and installation of 80 N163/5.X turbines for the Feijão wind farm in Brazil.
The order also includes a Service agreement for the turbines covering a period of 20 years. The 456 MW wind farm will be built in the states of Piauí and Pernambuco in the north-east of Brazil. The Nordex Group will be supplying and installing the 80 N163 turbines as of autumn 2023 on concrete towers with a hub height of 120 metres. The wind farm will start operation in spring 2024. The wind farm is part of the renewable energy project known as Feijão, a combined wind and solar energy project by the Green Investment Group and Hydro Rein with a total capacity of 586 MW. The energy produced will be supplied by the joint venture to Hydro’s aluminium refinery Alunorte and Hydro Paragominas the company’s bauxite mine on the basis of a long-term power purchase agreement.