RWE Renouvelables France has ordered ten N117 turbines for two wind farms with a total capacity of 33MW. Both projects in the north of France are part from the sale of Nordex Group's European wind and solar project development business to RWE in November 2020.
The Nordex Group is supplying six N117/3000 turbines on tubular steel towers with hub heights of 76 metres for the 18 MW onshore wind farm Les Hauts Bouleaux in the Oise Department. The 15MW Martinpuich wind farm in the Pas-de-Calais department will be equipped with four N117/3600 turbines with hub height of 91 metres, which are delivered in the operation mode of 3.675MW. Installation of the turbines will start in the current year and the commissioning of the turbines in both wind farms is scheduled for early 2022.