The team building Dogger Bank Wind Farm has officially marked the start of its offshore construction work with the installation of the first length of HVDC export cable off the Yorkshire coast.
NKT is leading the work to install the Dogger Bank A nearshore cable, that will connect the first phase of the windfarm more than 130km off the coast to a landfall point at Ulrome, in East Riding of Yorkshire. ACE Winches and LMR Drilling UK Ltd of Birkenhead are among the companies supporting NKT with this work. The campaign will continue during 2022, with work starting on the export cables for Dogger Bank B in East Riding, and Dogger Bank C on Teesside, in the consecutive years. NKT will supply and install the onshore and offshore HVDC cable for all three phases of the project. The company will use its cable-laying vessel NKT Victoria to install the 320kV DC subsea cable system.
Dogger Bank Wind Farm will be the first HVDC connected wind farm in the UK. Dogger Bank Wind Farm is being built in three phases known as A, B and C. The project is a joint venture between SSE Renewables (40%), Equinor (40%) and Eni Plenitude (20%).