PNE has sold two repowering wind farm projects in Germany to a group of private investors. The projects, Wulfsdorf A in Schleswig-Holstein and Kuhstedt III in Lower Saxony, have a combined installed capacity of 45 MW.
The Wulfsdorf A wind farm, located in the Ostholstein district, will comprise two Vestas V150 turbines rated at 6.0 MW each and two Vestas V162 turbines rated at 6.2 MW each, giving a total capacity of 24.4 MW. Construction is underway, with commissioning scheduled for December 2026.
The Kuhstedt III wind farm, located in the Rotenburg (Wümme) district, will have a capacity of 20.6 MW. It will consist of two Nordex N175 turbines rated at 6.8 MW each and one Nordex N163 turbine rated at 7.0 MW. Construction is also in progress, with commissioning expected around the turn of 2026/27.
Operational management of both wind farms will be provided by energy consult, a company within the PNE Group.




