S&C Electric Company has announced it was awarded a US$`2.6 milion contract by Sweetwater Wind to upgrade a portion of their 585MW wind farm in Sweetwater, Texas.
This upgrade will enable Sweetwater Wind to meet new renewable energy generation interconnection standards that have been enacted in Electric Reliability Council of Texas (ERCOT). Last year, ERCOT revised its grid code by modifying the reactive power capability requirements. The new standards require Sweetwater Wind to provide a lagging power factor capability of 0.95 or less and a leading power factor capability of 0.95 or less at the point of interconnection (POI). Sweetwater Wind turned to S&C for a solution to meet the new standards.