Siemens Gamesa has recently sealed deals with WPD, Brial and an energy company for the supply of 233 MW. All of these projects fall under the scope of the renewable capacity allocated in recent auctions.
The company has been mandated to supply 39 of its SG 3.4-132 turbines (135 MW) to independent power provider WPD at the El Poleo, Las Panaderas and Navillas wind farms, all of which are located in Valladolid. It will also service these facilities for five years. In addition, Siemens Gamesa has been contracted to supply Brial with another 20 turbines for the Tinajeros, Agón, La Nava and Los Cierzos wind farm developments in Zaragoza. The turbines to be installed at these complexes, a mix of the company's SG 3.4-132, SG 2.1-114 and SG 2.6-126 models, represent capacity totalling 62 MW. In this instance, the company will maintain and operate the wind farms for a period of 10 years. Lastly, Siemens Gamesa has executed an agreement with an important energy company for the delivery of 36 MW (11 turbines) at a development in Zaragoza. The majority of the blades for these turbines will be made at the Aoiz factory in Navarre, the As Samozas factory in Galicia and the Moroccan facility in Tangier. The nacelles, meanwhile, will be manufactured at the Ágreda factory in Soria.