Siemens has been awarded an order from Westar Energy to supply, support install and provide service for 122 wind turbines for the Western Plains Wind Farm project to be located near Spearville, Kansas, USA.
Installation of the wind turbines is scheduled to begin in early summer 2016, with the start of operations expected by early 2017. The service and maintenance provided by Siemens will include the company’s remote monitoring and diagnostics. The wind turbine blades for this project will be manufactured at the Siemens blade facility in Fort Madison, Iowa. The nacelles will be assembled at the Siemens facility in Hutchinson, Kansas. The project will feature Siemens SWT-2.3-108 wind turbines, each with a power rating of 2.3 MW and 53-meter blades.