The Nordex Group has received a 312 MW order in the USA. For a wind farm in Texas, the manufacturer will supply 65 N149/4.0-4.5 turbines in the 4.8MW operating mode.
Installation is scheduled to start in May 2021 and the wind farm will be connected to the grid later the same year. The project and customer are undisclosed.