MingYang Smart Energy and Goldwind have been selected to supply wind turbines for the Shanghai Fengxian Phase 1 offshore wind farm. Located in the north side of Hangzhou Bay, 12 kilometres off the coast, the 400MW Fengxian offshore wind project exists of four blocks.
These orders are for the two eastern blocks each with a capacity of 100MW. One block will feature MingYang’s 15 MySE6.45-180 turbines, with the turbine delivery scheduled to start in May 2021. Goldwind will deliver wind turbines for the second 100 MW block. The wind farm is joint project of Shanghai Electric Power and Shanghai Green Environmental Protection Energy Company.