Tekmar Energy has announced that Van Oord has selected the Tekmar Cable Protection System (CPS) TekLink Mechanical Latch for the Borssele 2 offshore wind farm.
Borssele 2 consisting of 77 turbines and a total of 731.5MW, will go into construction off the coast of Zeeland, the Netherlands in 2020. As part of the project, Tekmar will be supplying their latest TekLink Generation 8 cable protection system.