The order from SSE is for the Stronelairg wind farm located in Scotland, which will consist of 66 wind turbines totalling 228MW. The order consists of 53 V117-3.45 MW and 13 V112-3.45 MW turbines.
The tip heights of the turbines will be 135 metres and 125 metres respectively. The contract includes supply, installation and commissioning of the wind turbines as well as a 20-year Active Output Management 4000 (AOM4000) full scope operations and maintenance agreement. Delivery of the first turbines is planned for the third quarter of 2017, with commissioning completed in 2018.