
At a height of about 104 meters, the steel tube tower segments are installed. The hybrid tower has a total combined hub height of 164 metres, upon which, the Nordex turbine nacelle type N149/4.0-4.5 sits. The wind turbine in the municipality of Mitteldorf complements the Wipperdorf wind farm, which VSB commissioned in 2017.