
The full scope includes four Wärtsilä 46DF and two Wärtsilä 20DF dual-fuel engines, as well as Transverse and Steerable Thrusters, DP-3 solution, Navigation system, and selective catalytic reduction (SCR) systems for emissions abatement. The company will also provide site supervision services. The Wärtsilä equipment is scheduled to be delivered during 2021 and the ship is expected to begin operations in the Taiwan Straits in 2023.