
Monitoring and control of the KM components will be handled by a K-Chief marine automation system. Energy control functionalities will optimise energy efficiency of the vessels. The vessels will also include technology for the regeneration of power from the jacking system and cranes. KM has also included its onboard advisory system, EcoAdvisor, and a condition-based monitoring system to extend maintenance intervals and detect any anomalies in the rotating equipment. The first of the new WTIVs is expected to be delivered before the end of Q3 2024. The second is expected by Q1 2025.