Wood is continuing to support Statkraft on Fosen Vind, the largest onshore wind power project in Europe. The 1 GW project, which is located in central Norway on the peninsula of Fosen, comprises six onshore wind farms.
The team is currently installing 29 guyed lattice meteorological masts and performing data monitoring and analysis for the site calibration phase as part of a power performance testing (PPT) contract. This will be followed by the installation of power monitoring equipment fitted to a number of the wind turbine generators for the power curve test phase.