EDPR’s installed capacity increased to 13.8 GW(+1.2 GW YoY), with Europe and North America representing 40% and 51%of the portfolio, respectively, and a higher technology diversification with 12.2 GWof wind onshore, 1.3 GW of solar and 1.5 GW of gross wind offshore in operation.
In the last 12 months EDPR added 2.5GW of capacity. Following the completion of the Asset rotation deals in the US and in Portugal in the second half of 2021 and in Poland and Spain in 1H22, net capacity change YoY totalled +1.2GW. In the 1H22, additions amounted to 0.6 GW, mainly driven by the integration of Sunseap assets in APAC which now represent 3%of EDPR’s portfolio, and Asset rotation amounted to 0.3 GWin Europe. Capacity under construction is 3.2 GW as of Jun-22,with 1.8GW of wind and 1.3 GW of solar. EDPR generated 17.8 TWh of clean energy in the 1H22 (+16%YoY) with Europe and North America representing 36%and 57% of total generation output, respectively. In Europe, generation increased +10%YoY, impacted by higher installed capacity and a stable renewable resource. In North America, output is up +12%YoY reflecting better renewable resource in US and Canada. In South America, production increased +111% YoY driven by higher installed capacity in Brazil, partially offset by lower renewable resource.