Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


Enercon installs first E nacelle for customer project 300 200Enercon has installed the first E-nacelle for a customer in Germany. An E-160 EP5 E3 wind energy converter, featuring the E nacelle has been installed at a wind farm in Hämelhausen, Lower Saxony, Germany.
 
The new E-nacelle is box-shaped, 14.06 metres long, 4.99 metres wide and 3.40 metres tall. E-nacelles are fully cabled and tested already at the factory and its plug and play features optimise processes at the construction site. The E-160 EP5 E3 is one of three wind energy converters based on the new concept. The E-160 EP5 E3 has a nominal power of 5.56 MW. There is a selection of tower versions with hub heights between 99 and 166 metres. The rotor diameter of the E-160 EP5 E3 is 160 metres.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.