Gazelle Wind Power (Gazelle) has signed a memorandum of understanding (MOU) with Ferrofab FZE (Ferrofab), a UAE-based engineering and manufacturing firm, to establish a Center for Manufacturing Excellence at the Ferrofab Jebel Ali facility in the UAE.
This Center is being established to manufacture a Gazelle hybrid modular offshore wind platform, based on Gazelle’s technology, that can be scaled to support any make and model of wind turbines, including models upwards of 20MW. Ferrofab has 800,000 square feet of manufacturing space in Jebel Ali, which is about 40 kilometres southwest of Dubai.