Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


Vestas has introduced the V163-4.5MW, expanding the 4MW platform. The V163-4.5MW features an 18 percent increase in swept area and delivers up to ten percent higher Annual Energy Production (AEP) at park level compared to the V150-4.5 MW depending on site-specific conditions.
 
With 80.1m blades, the V163-4.5 MW has a large rotor-size-to-rating ratio resulting in a higher capacity factor and an increased power output at medium and lower wind speeds The new variant shares most major functional and physical designs across modules with the V150-4.2 MW and the V150-4.5 MW. The V163-4.5 MW is globally applicable, although it is particularly relevant for sites in the USA, Latin America, South Africa and parts of southern Europe.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.