Alstom has signed two contracts totalling around € 400 million with Queiroz Galvão to deliver, erect and commission 2.7MW ECO 122 wind turbines at two large wind farms, Caldeirão Grande I and II, both located in the state of Piauí State, Northeast of Brazil.
The wind farms Caldeirão Grande I and II will generate 400MW. The wind turbines will be produced at Alstom manufacturing unit in Camaçari (Bahia State) and will be delivered between 2015 and 2017.