OutSmart has signed a long-term agreement for the Technical Operations of the onshore wind farm of NOP Agrowind in the Noordoostpolder, the Netherlands.
The project consists of 26 E126 7.5MW Enercon turbines with a total installed capacity of 195MW. The first wind turbine will commence operations in August 2014. OutSmart provides the Technical Operations, consisting of 24/7 operational overview, performance analyses, reporting, Health, Safety and Environmental coordination, interface management, quality assurance and control, inspections, PPA coordination (power prediction, power reduction and planning).