Siemens Gamesa has awarded Cadeler a contract of approximately 90m USD, with an additional 30m USD in options, to transport and install turbines of the SG 14-222 DD model.
The company announcement did not mention detailed information about possible projects and timeline. The turbines will have an individual capacity of 14MW. Cadeler’ s vessels will install the wind turbines which will be 252 meters in height from sea level to the tip of the rotor blade and will have blades with a length of 108 meters.