
The 1,900 mt topside has a 242 MW power output capacity and has been completely designed by our teams and fabricated in Saint-Nazaire. It will collect and export the power generated by the offshore wind turbines through dedicated submarine cables while remotely controlling and monitoring the operation of the offshore windfarm.