
The 640MW Yunlin Offshore Wind Farm will feature 80 Siemens Gamesa 8MW turbines, half of which will use CTCI MAC’s transition pieces. The first batch of transition pieces is set to be loaded out on a barge operated by wpd in early August from CTCI MAC’s Ta-Lin Shop in Kaohsiung to the offshore site for installation. The rest will be delivered in batches throughout this year.