All 102 Siemens Gamesa offshore wind turbines – situated 43km off the Suffolk coast – are now fully operational, with the capacity to produce 714MW of clean energy.
Around 20 per cent of the turbine installation and around half the turbine connection work was completed during lockdown, with ScottishPower Renewables and its project partners transforming how they worked to get the job done. This included switching to a higher number of smaller vessels, creating crew ‘households’ who lived and worked together at all times, introducing new welfare protocols and minimising crew changes. Almost 3,500 jobs were sustained during the construction phase, which began in 2017, while 100 long-term skilled jobs have been created at the operations and maintenance base in Lowestoft.