DNV has signed a USD 17.7 million (NOK 150 million) contract to be the Owner’s Engineer for Taipower Offshore Wind Project Phase II (Changhua Phase II) in Taiwan. The offshore wind farm is being developed by Taiwan Power Company (Taipower).
The work scope lasting into the second half of 2025 will see DNV support project engineering reviews and marine coordination during wind farm construction. The scope over the project life cycle right through to commissioning includes design review, fabrication assurance, and construction assurance. Detailed design of the 31-turbine project is due this year, with the wind farm scheduled to be online by autumn 2025.