Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


The Doris - Hyundai Heavy Industries (HHI) consortium has been awarded a Front-End Engineering Design (FEED) contract by Corio Generation and TotalEnergies for their Ulsan Gray Whale 3 Offshore Windfarm project, located offshore the east coast of South Korea.
 
The FEED contract covers the full integrated scope of activities related to the floating units, including the design, the procurement & installation of the floaters and their station keeping systems, the procurement, laying and connections of the inter array cables to the floaters as well as the activities related to the integration of the turbines on the floaters. The Gray Whale 3 Project, aiming to develop a 504MW floating offshore wind farm located around 60 to 70 kilometers from Onsan Port in Ulsan, is one of the three offshore wind projects with a total installed capacity of 1.5GW that Corio and TotalEnergies are promoting off the coast of Ulsan (project name: Gray Whale 1,2,3).
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.