Ecowende and Van Oord will collaborate on the construction of the offshore wind farm on Hollandse Kust (west) lot VI. As Ecowende's contractor, Van Oord will be responsible for transporting and installing the foundations.
Van Oord will also design, procure and lay the connecting cables between the wind turbines. Finally, Van Oord will be handling the transportation and installation of the wind turbines at sea. Ecowende is a joint venture of Shell and Eneco.