EDP Renewables (EDPR) has secured a 15-year Power Purchase Agreement (PPA) with Procter & Gamble (NYSE:PG) for 127.5MW.
The agreement is linked to two projects which will come into operation in 2023. These energy parks will be located in Peñaflor (Valladolid), with 100MW of installed capacity, and Sierra de la Venta (Albacete), with an installed capacity of 47.5MW. Of these, 27.5 MW are part of the PPA signed with P&G.