SMart Wind has now received consent to install its first Met Mast in the Hornsea Zone. Emu Limited assisted SMart Wind with the Marine Licence application for the consent, which are awarded by the Marine Management Organisation (MMO).
Emu Limited was the first organisation to use the new online Marine Licensing System which was indicated by the automated application number reference of “00001”. EMU Limited has continued to support SMart Wind with their consenting requirements and has now received successful consents for geotechnical and benthic surveys.
Emu Limited was the first organisation to use the new online Marine Licensing System which was indicated by the automated application number reference of “00001”. EMU Limited has continued to support SMart Wind with their consenting requirements and has now received successful consents for geotechnical and benthic surveys.